Tekurat –w ( Polyisocyanurate panels for Ceiling Insulation):- CFC-free Polyisocyanurate rigid foam sheet laminated with vliepatex-N ( Vliepa, Germany) from one side and Aluminium foil from the other side, The density of the panel is 40-45 Kg/m3.. Vliepatex is specially used as lamination for the PIR, PU panels, suitable for coating materials like epoxy coating ,acrylic coating, etc. 

Technical Data:-

         1. Tekurat –w ( Polyisocyanurate panels for Ceiling Insulation):-

Density

ASTM C 303: 2002

40-45 kg/m³

Water absorption by volume

ASTM C 209: 1998

0.03%

Thermal conductivity group

ASTM C518: 2002

K=0.023 W/mk

Characteristics in fire

DIN 4102-1

B2

Temperature stability

Upto 250 Deg C in short term ,constant from -50 Deg C until + 110 Deg C

Pressure load

0.1 N/mm² oder 10 t/m²

 2. Vliepatex-N:-

 

Material:

EN 29073-1

Glass fibre: SH 50    approx.48-60 g/m²

Material coating        approx. 230 g/m²

Mass per unit area:

EN 29073-1

Approx. 290 g/ m² ± 10%

Thickness:

ISO EN 9073-2

< 0.6 mm

Rest moisture content:

ISO 287

< 0.8%

Class of fire

DIN 4102-1

B2

Tensile strength

Machine direction:

Cross machine direction

EN 29073-3

 

2.0%

2.0%

Water vapour permeability

DIN 53122-1

Ca.123 g/ m² x d

Application: Used as lamination material  for the PIR , PU panels, suitable for coating materials like epoxy coating ,acrylic coating etc.

 

METHOD OF APPLICATION

 

 

    Fig 1

1) Drill a hole of depth 7.5 cm using a 10 mm drill bit along with the insulation panel. (Ref Fig-1)
    2) Fix the plug in the hole
    3) Insert the nylon nail using a mallet.
    4) Hammer the nylon nail along with plug.
    5) Hammering the plug head 2 mm inside the panel. 

 

                                             Fig 2

 

Fixing the self adhesive mesh on the head of the plugs and all over the joints (Ref Fig-2)

1) Applying the filler all over the plug heads and joints 
        (Ref Fig-3)
    2) Applying primer all over the surface.  
    3) Applying the final coating. 

Note:-
1) Surfaces should be checked to ensure the leveling before fixing the panels.
2) All the joints between the panels should be closed tightly.

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 